Roadway repairs are year-round activities that are undertaken by the Town of Millet’s Public Works Department. Throughout the winter months, staff will address problem areas as required. However, during the summer construction season, dedicated crew systematically inspect, assess and repair all town roads on a priority basis.
In the spring, as potholes become a prevalent issue, patching of roadways becomes a high priority activity. Public Works crews typically use an “instant patch” type of product to complete the repairs.
REPORT POTHOLES
The public can report potholes by calling 780.387.4554 or send an email to admin@millet.ca
All inquiries will be inspected and work will be scheduled depending on priority.
POTHOLE PATCHING PRIORITY RANKING
1. Collector Roads – Completed annually
2. Residential Roads – Completed every 3 years